Alston Middle School - Ceiling Grid, Tile and Lighting Replacements

Project Summary

  • Funding Source - 2024 Referendum
  • Status - On Hold
    • Design approved by OSF
    • Project on hold due to change in scope of work.
  • Estimated Completion Date: TBD

Campus Facts

  • Built in 1953
  • Upgrades in: 1990, 2001, 2016

 

  • 2024 Referendum
  • In Progress
Alston Middle School - HVAC Replacements

Project Summary

  • Funding Source - TIF Funds
  • Status - Completed

Campus Facts

  • Built in 1953
  • Upgrades in: 1990, 2001, 2016
  • Completed
  • TIF Funds
Alston Middle School - Interior Wall Abatement/Renovation

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 1953
  • Upgrades in: 1990,2001, 2016
  • 2024 Referendum
  • Completed
Alston Middle School - Outside Renovations

Project Summary

  • Funding Source - TIF Funds
  • Status
    • Phase 1 - Renovate Courtyard
      • Completed
    • Phase 2 - SHS Tennis Court
      • In Progress

Campus Facts

  • Built in 1953
  • Upgrades in: 1990, 2001, 2016
  • In Progress
  • TIF Funds
Alston Middle School - Replace Interior Doors and Frames

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed 7/31/2026

 

Campus Facts

  • Built in 1953
  • Upgrades in: 1990, 2001, 2016
  • 2024 Referendum
  • Completed
Alston Middle School - Restroom Renovations

Project Summary

  • Funding Source - 2024 Referendum
  • Status
    • Tile and fixtures are being installed
  • Estimated Completion Date: Summer 2026

Campus Facts

  • Built in 1953
  • Upgrades in: 1990, 2001, 2016

 

  • 2024 Referendum
  • In Progress
Alston Middle School - Roof Replacement Section 1

Project Summary

  • Funding Source - TIF Funds
  • Status
    • Completed

Campus Facts

  • Built in 1953
  • Upgrades in: 1990, 2001, 2016
  • Completed
  • TIF Funds
Alston Middle School - Safety and Security Upgrades

Project Description

  •  Additional cameras
  • Weapons Detection
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Impact resistant film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status -  Completed

Campus Facts

  • Built in 1953
  • Upgrades in: 1990, 2001, 2016
  • 2024 Referendum
  • Completed
Alston-Bailey Elementary - HVAC Controls Conversion

Project Summary

  • Funding Source - Capitol Funds
  • Status - Not Started

Campus Facts

  • Built in 2016
  • Capital Funds
  • Planning
Alston-Bailey Elementary - Landscape Front Corner Lot

Project Summary

  • Funding Source - TIF Funds
  • Status - Completed

Campus Facts

  • Built in 2016
  • Completed
  • TIF Funds
Alston-Bailey Elementary - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Secured Vestibule
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 2016
  • 2024 Referendum
  • Completed
ASHLEY RIDGE CAR RIDER LOOP UPGRADE

Project Summary

  • Funding Source - 2024 Referendum
  • Status
    • Initial cut and proof roll is complete- ready for paving by the end of week of 7/13/26 (weather permitting)
    • Scheduled Completion Date- week of 7/27/2026​

Campus Facts

  • Built in 2008
  • Upgrades in: 2011, 2014
  • 2024 Referendum
  • In Progress
Ashley Ridge High School - Classroom Additions & Rennovations

Project Summary

  • Funding Source - 2024 Referendum
  • Status 
    • Completed

Campus Facts

  • Built in 2008
  • Upgrades in: 2011, 2014

 

  • 2024 Referendum
  • Completed
Ashley Ridge High School - Roof Replacement - Section 5 (Grade F)

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed July 2026

Campus Facts

  • Built in 2008
  • Upgrades in: 2011, 2014

 

  • 2024 Referendum
  • Completed
Ashley Ridge High School - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Weapons Detection
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 2008
  • Upgrades in: 2011, 2014

 

  • 2024 Referendum
  • Completed
Ashley Ridge High School - Wi-Fi Infrastructure Expansion

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 2008
  • Upgrades in: 2011, 2014

 

  • 2024 Referendum
  • Completed
Beech Hill Elementary - Ceiling Grid, Tile, and Lighting Replacement

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed 7/27/2026

Campus Facts

  • Built in 1992
  • Upgrades in: 1992, 1997
  • 2024 Referendum
  • Completed
Beech Hill Elementary - Playground Renovations

Project Summary

  • Funding Source - Capital Funds
  • Status - Completed

Campus Facts

  • Built in 1992
  • Upgrades in: 1992, 1997

 

  • Capital Funds
  • Completed
Beech Hill Elementary - Roof Replacement -Section 1 (Grade F)

Project Summary

  • Funding Source - 2024 Referendum
  • Status. 
    • Punch list in  progress
  • Estimated Completion Date: August 2026

Campus Facts

  • Built in 1992
  • Upgrades in: 1992, 1997
  • 2024 Referendum
  • In Progress
Beech Hill Elementary - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Secured Vestibule
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 1992
  • Upgrades in: 1992, 1997
  • 2024 Referendum
  • Completed
Bus Maintenance Facility at Oakbrook Depot

Project Summary

  • Funding Source - General Fund
    • Approved in 2023
  • Status
    • Pre-Engineered Metal Building (PEMB) erection is ongoing​

    • Scheduled completion 8/27/2026​

  • Estimated Completion Date: TBD

 

  • General Funds
Dubose Middle School - Gym Locker Room Renovation

Project Summary

  • Funding Source - Capital Funds
  • Status - Design in Progress
  • Estimated completion: Summer 2027

Campus Facts

  • Built in 1985
  • Capital Funds
  • Planning
Dubose Middle School - Replace Concrete and Improve Drainage in Courtyard

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 1985
  • 2024 Referendum
  • Completed
Dubose Middle School - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Weapons Detection
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Impact resistant film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 1985
  • 2024 Referendum
  • Completed
Dubose Middle School - Student Restroom Renovations

Project Summary

  • Funding Source - 2024 Referendum
  • Status
    • Design in Progress
  • Estimated Completion Date: Summer 2027

Campus Facts

  • Built in 1985
  • 2024 Referendum
  • Planning
Eagle Nest Elementary - Exterior Wall Renovation/ Windows

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Design in progress
  • Estimated Completion Date: Summer 2027

Campus Facts

  • Built in 2007
  • Upgrades in: 2016
  • 2024 Referendum
  • Planning
Eagle Nest Elementary - Roof Replacement -Section 1 (Grade F)

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Design in Progress
  • Estimated Completion Date: Summer 2027

Campus Facts

  • Built in 2007
  • Upgrades in: 2016
  • 2024 Referendum
  • Planning
Eagle Nest Elementary - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 2007
  • Upgrades in: 2016
  • 2024 Referendum
  • Completed
East Edisto Middle School - Additional Parking

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 2022

 

  • 2024 Referendum
  • Completed
East Edisto Middle School- Safety and Security Upgrades

Project Description

  • Additional cameras
  • Weapons Detection
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 2022

 

  • 2024 Referendum
  • Completed
Elementary School - New School (Ponds)

Project Summary

  • Funding Source - 2024 Referendum
  • Status
    • Delay in conveyance of land                                                     
  • Estimated Completion Date: TBD
  • 2024 Referendum
Elementary School - New School (Yerby Tract)

Project Summary

  • Funding Source - 2024 Referendum
  • Status
    • Board approved reallocation of funds at November 10, 2025 meeting.
  • Estimated Completion Date: TBD

 

  • 2024 Referendum
Eugene Sires Elementary - HVAC Controls Conversion

Project Summary

  • Funding Source - Capital Funds
  • Status - Not Started

Campus Facts

  • Built in 2016
  • Capital Funds
  • Planning
Eugene Sires Elementary - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 2016
  • 2024 Referendum
  • Completed
Flowertown & Newington Elementary - Bus/Car Rider Loop Reconfiguration

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

Flowertown Elementary

  • Built in 1977
  • Upgrades in: 1981, 1989, 2016

Newington Elementary

  • Built in 1975
  • Upgrades in: 1989, 2000, 2016
  • 2024 Referendum
  • Completed
Flowertown & Newington Elementary - Ceiling Grid, Tile and Lighting Replacement

Project Details

  • NES will be performed in 2 phases.
  • FES to begin after NES  is complete.

Project Summary

  • Funding Source - 2024 Referendum
  • Status 
    • Received OSF approval and project will be put out for bid
    • NES Phase 1 - NES Phase 1 completed July 2027

Campus Facts

Flowertown Elementary

  • Built in 1977
  • Upgrades in: 1981, 1989, 2016

Newington Elementary

  • Built in 1975
  • Upgrades in: 1989, 2000, 2016
  • 2024 Referendum
  • In Progress
Flowertown & Newington Elementary - HVAC Replacements

Project Summary

  • Funding Source - Capital Funds
  • Status: Not Started
  • Estimated Completion Date: TBD

Campus Facts

Flowertown Elementary

  • Built in 1977
  • Upgrades in: 1981, 1989, 2016

Newington Elementary

  • Built in 1975
  • Upgrades in: 1989, 2000, 2016
  • Capital Funds
  • Planning
Flowertown & Newington Elementary - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Secured Vestibule
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

Flowertown Elementary

  • Built in 1977
  • Upgrades in: 1981, 1989, 2016

Newington Elementary

  • Built in 1975
  • Upgrades in: 1989, 2000, 2016
  • 2024 Referendum
  • Completed
Flowertown & Newington Elementary - Transite Panel Abatement & Replacement Phase 1

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed 
    • Phase 1 (pods & hallways) Complete

Campus Facts

Flowertown Elementary

  • Built in 1977
  • Upgrades in: 1981, 1989, 2016

Newington Elementary

  • Built in 1975
  • Upgrades in: 1989, 2000, 2016
  • 2024 Referendum
  • Completed
Flowertown & Newington Elementary - Transite Panel Abatement & Replacement Phase 2

Project Details

  • FES & NES Phase 1 (pods & hallways) Complete;
  • Phase 2 (classrooms) are currently out for bid for NES.  
  • FES to begin after NES complete.

Project Summary

  • Funding Source - 2024 Referendum
  • Status 
    • Phase 2 (classrooms) to begin Summer 2026
  • Estimated Completion Date: Coinciding with Ceiling Grid, Tile and Lighting Replacement project

Campus Facts

Flowertown Elementary

  • Built in 1977
  • Upgrades in: 1981, 1989, 2016

Newington Elementary

  • Built in 1975
  • Upgrades in: 1989, 2000, 2016
  • 2024 Referendum
  • In Progress
Fort Dorchester Elementary - Exterior Wall Renovation

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Design in progress
  • Estimated Completion Date: Summer 2027

Campus Facts

  • Built in 2002
  • 2024 Referendum
  • Planning
Fort Dorchester Elementary - Gutter Replacements-Sections 1-7

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Design in progress
  • Estimated Completion Date: Summer 2027

Campus Facts

  • Built in 2002
  • 2024 Referendum
  • Planning
Fort Dorchester Elementary - HVAC Replacements

Project Summary

HVAC Units installed; Installing HVAC control system currently

  • Funding Source - Capital Funds
  • Status
    • All HVAC units installed. 

    • 2 more units to startup as controls installation is in progress. RTU duct work finishing up in cafe​

  • Estimated Completion Date: Summer 2026

Campus Facts

  • Built in 2002
  • Capital Funds
  • In Progress
Fort Dorchester Elementary - Roof Replacements - Sections 1, 3 (Grade F)

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Design in progress
  • Estimated Completion Date: Summer 2027

Campus Facts

  • Built in 2002
  • 2024 Referendum
  • Planning
Fort Dorchester Elementary - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Secured Vestibule
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 2002
  • 2024 Referendum
  • Completed
Fort Dorchester High School - Classroom & lighting renovations

Project Summary

  • Funding Source - 2024 Referendum
  • Status Contract awarded
  • Estimated Completion Date: August 2027

Campus Facts

  • Built in 1991
  • Upgrades in 1998, 2000, 2001, 2011, 2024

 

  • 2024 Referendum
  • Planning
Fort Dorchester High School - Paving of Parking Lot and Bus Loop

Project Summary

  • Funding Source - Capital Funds
  • Status - Not Started
  • Estimated Completion Date: Summer 2027

Campus Facts

  • Built in 1991
  • Upgrades in 1998, 2000, 2001, 2011, 2024

 

  • Capital Funds
  • Planning
Fort Dorchester High School - Replace Gym Floor

Project Summary

  • Funding Source - Capital Funds
  • Status - PO issued to vendor 
  • Estimated Completion Date: April 2026

Campus Facts

  • Built in 1991
  • Upgrades in 1998, 2000, 2001, 2011, 2024

 

  • Capital Funds
  • In Progress
Fort Dorchester High School - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Weapons Detection
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 1991
  • Upgrades in 1998, 2000, 2001, 2011, 2024

 

  • 2024 Referendum
  • Completed
Gregg Middle School - Exterior Wall Renovation

Project Summary

  • Funding Source - 2024 Referendum
  • Status
    • Design complete
    • Contract awarded.
    • Pre-construction meeting scheduled 5/6/26
  • Estimated completion: August 2026

Campus Facts

  • Built in 1973
  • Upgrades in: 1998

 

  • 2024 Referendum
  • In Progress
Gregg Middle School - Gym Floor Resurfacing

Project Summary

  • Funding Source - Capital Funds
  • Status 
    • Touch-ups scheduled for Spring Break
  • Estimated Completion Date: April 2026

Campus Facts

  • Built in 1973
  • Upgrades in: 1998

 

  • Capital Funds
  • In Progress
Gregg Middle School - HVAC Replacements

Project Summary

  • Funding Source - Capital Funds
  • Status 
    • Phase 1 - Installation of rooftop units
      • Completed
    • Phase 2 - Installation of minimal interior classroom wall units
      • Estimated completion: August 2026

Campus Facts

  • Built in 1973
  • Upgrades in: 1998

 

  • Capital Funds
  • In Progress
Gregg Middle School - Renovation of Courtyard

Project Summary

  • Funding Source - Capital Funds
  • Status
    • Nearing completion
  • Estimated completion: June 2026

Campus Facts

  • Built in 1973
  • Upgrades in: 1998

 

  • Capital Funds
  • In Progress
Gregg Middle School - Roof Replacements - Sections 1-6 (Grade F)

Project Summary

  • Funding Source - 2024 Referendum
  • Status
    • Project is underway
  • Estimated Completion Date: August 2026

Campus Facts

  • Built in 1973
  • Upgrades in: 1998

 

  • 2024 Referendum
  • In Progress
Gregg Middle School - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Weapons Detection
  • Radio project.  Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 1973
  • Upgrades in: 1998
  • 2024 Referendum
  • Completed
Joseph Pye Elementary - Exterior Wall Renovation

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Design in progress
  • Estimated Completion Date: Summer 2027

Campus Facts

  • Built in 2011
  • 2024 Referendum
  • Planning
Joseph Pye Elementary - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Secured Vestibule
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 2011
  • 2024 Referendum
  • Completed
Knightsville Elementary - Abatement, Repaint & Refloor Buildings and Classrooms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 1948
  • Upgrades in: 1966, 1991, 1997, 2001
  • 2024 Referendum
  • Completed
Knightsville Elementary - Additions and Renovations

Project Summary

  • Funding Source - 2024 Referendum. Funded out of the reallocation of Yerby funds.
  • Status
    • Design Development is in progress
  • Estimated Completion time: TBD

Campus Facts

  • Built in 1948
  • Upgrades in: 1966, 1991, 1997, 2001
  • 2024 Referendum
  • Planning
Knightsville Elementary - Exterior Wall Renovation

Project Summary

  • Funding Source - 2024 Referendum
  • Status: Contract awarded to vendor. Project on hold due to campus upgrade per Board approval.
  • Estimated Completion time: NA 

Campus Facts

  • Built in 1948
  • Upgrades in: 1966, 1991, 1997, 2001
  • 2024 Referendum
  • Planning
Knightsville Elementary - Roof Replacement - Section 1 (Grade F)

Project Summary

  • Funding Source - 2024 Referendum
  • Status: Contract awarded to vendor. Project on hold due to campus upgrade per Board approval.
  • Estimated Completion Date: NA

Campus Facts

  • Built in 1948
  • Upgrades in: 1966, 1991, 1997, 2001
  • 2024 Referendum
  • Planning
Knightsville Elementary - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 1948
  • Upgrades in: 1966, 1991, 1997, 2001
  • 2024 Referendum
  • Completed
Newington Elementary - Playground Renovations

Project Summary

  • Funding Source - Capital Funds
  • Status - Completed

Campus Facts

  • Built in 1975
  • Upgrades in: 1989, 2000, 2016

 

  • Capital Funds
  • Completed
Oakbrook Elementary - Exterior Wall Renovation

Project Summary

  • Funding Source - 2024 Referendum
  • Status
    • Completed May 2026

Campus Facts

  • Built in 1985
  • Upgrades in: 1997, 2026
  • 2024 Referendum
  • Completed
Oakbrook Elementary - HVAC Replacements

Project Summary

  • Funding Source - Capital Funds
  • Status - Completed

Campus Facts

  • Built in 1985
  • Upgrades in: 1997, 2026
  • Capital Funds
  • Completed
Oakbrook Elementary - New and Replacement Playground Equipment

Project Summary

  • Funding Source - Capital Funds
  • Status - Completed

Campus Facts

  • Built in 1985
  • Upgrades in: 1997, 2026
  • Capital Funds
  • Completed
Oakbrook Elementary - Repave Parking Lot

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 1985
  • Upgrades in: 1997, 2026
  • 2024 Referendum
  • Completed
Oakbrook Elementary - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Secured Vestibule
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 1985
  • Upgrades in: 1997, 2026
  • 2024 Referendum
  • Completed
Oakbrook Elementary - Ten Classroom Addition

Project Summary

  • Funding Source - TIF Funds
  • Status
    • Completed

Campus Facts

  • Built in 1985
  • Upgrades in: 1997, 2026

 

  • Completed
  • TIF Funds
Oakbrook Middle School - 10 Classroom Addition

Project Summary

  • Funding Source - TIF Funds
  • Status
    • Planning

Campus Facts

  • Built in 1985
  • Upgrades in: 2025

 

  • Planning
  • TIF Funds
Oakbrook Middle School - Cafe Renovations

Project Summary

  • Funding Source - 2024 Referendum
  • Status
    • Design complete
  • Estimated Completion Date: Summer 2026

Campus Facts

  • Built in 1985
  • Upgrades in: 2025

 

  • 2024 Referendum
  • In Progress
Oakbrook Middle School - Exterior Wall Repairs

Project Summary

  • Funding Source - 2024 Referendum
  • Status
    • Completed May 2026

Campus Facts

  • Built in 1985
  • Upgrades in: 2025
  • 2024 Referendum
  • Completed
Oakbrook Middle School - Gym Locker Room Renovation

Project Summary

  • Funding Source - Capital Funds
  • Status - Design in Progress
  • Estimated Completion Date: Summer 2027

Campus Facts

  • Built in 1985
  • Upgrades in: 2025

 

  • Capital Funds
  • Planning
Oakbrook Middle School - HVAC Replacements

Project Summary

  • Funding Source - Capital Funds
  • Status - Planning

Campus Facts

  • Built in 1985
  • Upgrades in: 2025

 

  • Capital Funds
  • Planning
Oakbrook Middle School - Repave Parking Lot

Project Summary

  • Funding Source - 2024 Referendum
  • Status
    • Work on active campus is complete.  Remaining work will finish after construction is complete.
  • Estimated Completion Date: Summer 2026

Campus Facts

  • Built in 1985
  • Upgrades in: 2025

 

  • 2024 Referendum
  • In Progress
Oakbrook Middle School - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Weapons Detection
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 1985
  • Upgrades in: 2025

 

  • 2024 Referendum
  • Completed
River Oaks Middle School - Exterior Wall Renovation/ Windows

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Design in progress
  • Estimated Completion Date - Summer 2027

Campus Facts

  • Built in 2007

 

  • 2024 Referendum
  • Planning
River Oaks Middle School - HVAC Replacements

Project Summary

  • Funding Source - Capital Funds
  • Status - Not Started
  • Estimated Completion Date: TBD

Campus Facts

  • Built in 2007

 

  • Capital Funds
  • In Progress
River Oaks Middle School - Roof Replacements - Section 1

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Design in progress
  • Estimated Completion Date - Summer 2027

Campus Facts

  • Built in 2007

 

  • 2024 Referendum
  • Planning
River Oaks Middle School - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Weapons Detection
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 2007

 

  • 2024 Referendum
  • Completed
Rollings Middle School of the Arts - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Weapons Detection
  • Radio project.  Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 2017

 

  • 2024 Referendum
  • Completed
Sand Hill Elementary - HVAC Controls Conversion

Project Summary

  • Funding Source - Capital Funds
  • Status - PO issued
  • Estimated completion date: August 2026

Campus Facts

  • Built in 2016
  • Upgrades in: 1997, 2025
  • Capital Funds
  • In Progress
Sand Hill Elementary - New Addition - 10 Classrooms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 2016
  • Upgrades in: 1997, 2025
  • 2024 Referendum
  • Completed
Sand Hill Elementary - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 2016
  • Upgrades in: 1997, 2025
  • 2024 Referendum
  • Completed
Spann Elementary - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 1960
  • Upgrades in: 1962, 1991, 1998
  • 2024 Referendum
  • Completed
Summerville Elementary - HVAC Replacements

Project Summary

  • Funding Source - Capital Funds
  • Status - Completed

Campus Facts

  • Built in 1950
  • Upgrades in: 1956, 1991, 2000, 2026
  • Capital Funds
  • Completed
Summerville Elementary - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 1950
  • Upgrades in: 1956, 1991, 2000, 2026
  • 2024 Referendum
  • Completed
Summerville Elementary - Wing Addition - 16 classrooms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed July 2026

Campus Facts

  • Built in 1950
  • Upgrades in: 1956, 1991, 2000, 2026
  • 2024 Referendum
  • Completed
Summerville High School - HVAC Replacements

Project Summary

  • Funding Source -Capital Funds
  • Status 
  • Phase 1 - Currently installing some rooftop units
  • Phase 2 - Interior units installation has not started
  • Estimated Completion Date: Summer 2026

Campus Facts

  • Built in 1969
  • Upgrades in: 1971, 1976, 1997, 1986, 1988, 2001, 2016, 2018

 

  • Capital Funds
  • In Progress
Summerville High School - Construct New Gym & Renovate Aux Gym to Classrooms

Project Summary

  • Funding Source - 2024 Referendum
  • Status
    • Construction Documents have been reviewed by OSF
    • Comments from review are being addressed by the design team
    • GC will be mobilizing week of 7/13/26
  • Estimated Completion Date: TBD

Campus Facts

  • Built in 1969
  • Upgrades in: 1971, 1976, 1997, 1986, 1988, 2001, 2016, 2018

 

  • 2024 Referendum
  • Planning
Summerville High School - Paving for Parking Lot and Bus Loop

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 1969
  • Upgrades in: 1971, 1976, 1997, 1986, 1988, 2001, 2016, 2018

 

  • 2024 Referendum
  • Completed
Summerville High School - Restroom and Classroom renovations

Project Summary

  • Funding Source - 2024 Referendum
  • Status - In Progress
  • Estimated Completion Date: August 2026

Campus Facts

  • Built in 1969
  • Upgrades in: 1971, 1976, 1997, 1986, 1988, 2001, 2016, 2018

 

  • 2024 Referendum
  • In Progress
Summerville High School - Roof Replacement - Section 1 (Grade F)

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Planning
  • Estimated Completion Date: TBD

Campus Facts

  • Built in 1969
  • Upgrades in: 1971, 1976, 1997, 1986, 1988, 2001, 2016, 2018

 

  • 2024 Referendum
  • Planning
Summerville High School - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Weapons Detection
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 1969
  • Upgrades in: 1971, 1976, 1997, 1986, 1988, 2001, 2016, 2018

 

  • 2024 Referendum
  • Completed
Summerville High School - Tennis Courts

Project Summary

  • Funding Source - TIF and Capital Funds
  • Status 
    • Design in progress

Campus Facts

  • Built in 1969
  • Upgrades in: 1971, 1976, 1997, 1986, 1988, 2001, 2016, 2018

 

  • Capital Funds
  • Planning
  • TIF Funds
William Reeves Elementary - Exterior Wall Renovation

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Planning
  • Estimated Completion Date: TBD

Campus Facts

  • Built in 2007
  • 2024 Referendum
  • Planning
William Reeves Elementary - HVAC Replacements

Project Summary

  • Funding Source - Capital Funds
  • Status
    • HVAC project in progress (26 units installed) Completionscheduled for 7/31​

  • Estimated Completion Date: Summer 2026

Campus Facts

  • Built in 2007
  • Capital Funds
  • In Progress
William Reeves Elementary - Roofing Replacement- Sect. 2

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Planning
  • Estimated Completion Date: TBD

Campus Facts

  • Built in 2007
  • 2024 Referendum
  • Planning
William Reeves Elementary - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Radio project.  Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 2007
  • 2024 Referendum
  • Completed
William Reeves Elementary - William Reeves Elementary Roof Replacement- Section 1 (Grade F)

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Planning
  • Estimated Completion Date: TBD

Campus Facts

  • Built in 2007
  • 2024 Referendum
  • Planning
Windsor Hill Arts Infused Elementary - Exterior Wall Renovation

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 1990
  • Upgrades in: 1997
  • 2024 Referendum
  • Completed
Windsor Hill Arts Infused Elementary - HVAC Replacement

Project Summary

  • Funding Source - Capital Funds
  • Status
    • Phase 1 - Rooftop units installed
    • Phase 2 - Installation of Scholar units in progress
  • Estimated completion date: 7/24/26

Campus Facts

  • Built in 1990
  • Upgrades in: 1997
  • Capital Funds
  • In Progress
Windsor Hill Arts Infused Elementary - Repave, Restripe, Repair and Replace Curb

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Requesting quote from approved vendors under new contract
  • Estimated Completion Date: TBD

Campus Facts

  • Built in 1990
  • Upgrades in: 1997
  • 2024 Referendum
  • Planning
Windsor Hill Arts Infused Elementary - Roof Replacements - Sections 1-3 (Grade F)

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 1990
  • Upgrades in: 1997
  • 2024 Referendum
  • Completed
Windsor Hill Arts Infused Elementary - Safety and Security Upgrades

Project Description

  • Additional cameras
  • Radio project. Allows schools to communicate with:
    • First Responders
    • District Office
    • Other Schools
  • Impact resistant window film
  • Door alarms

Project Summary

  • Funding Source - 2024 Referendum
  • Status - Completed

Campus Facts

  • Built in 1990
  • Upgrades in: 1997
  • 2024 Referendum
  • Completed